Aluminum Grating|Aluminum Louvers|Expanded Grating|HYindustries
  • Home
  • About
  • Products
    • Aluminum Grating
      • Serrated Grating
      • Flush Top Grating
      • T bar Grating
      • Press locked Grating
      • I bar Grating
      • Swaged plain Grating
    • Aluminum Louvers
      • Sunscreen Louvers
      • Trafficable Louvers
    • Expanded Walkway
      • EWG 13
      • EWG 22
      • EWG 30
      • EWG 40
    • Perforated Metal
      • Perforated Plate
    • Aluminum Stanchions
    • Steel Stanchions
    • Other Products
  • Services
    • Design Services
    • Customized Solutions
    • Fabrication Services
    • Packaging and Logistics
  • Project
  • Resources
    • Catalogs
  • Location
    • Australia
    • Europe
    • New Zealand
    • North America
    • Asia
  • FAQ
  • Blog
  • EN
    • EN
    • 中文
2025年5月15日 by HYindustries

Deutsche Bank’s new headquarters in London

Deutsche Bank’s new headquarters in London
2025年5月15日 by HYindustries

21 Moorfields is the new headquarters for Deutsche Bank in the City of London.

Originally commissioned by Landsec in 2012 and following three successful planning applications and five years on site, the development sits proudly above a new ticket hall for the Elizabeth Line.

Incorporating new pedestrianised streets, squares, walkways and an extended bridge to the Barbican; the development is suspended over a complex train interchange using a steel bridge structure.

The building more than doubles the previous capacity of this key site, providing exemplary workspace for some of the additional 1.5 million people that, thanks to the new Elizabeth Line, are now within 50 minutes of central London.

The arrival of the Elizabeth Line triggered a re-evaluation of London’s Moorgate/London Wall area, bringing forward the development of the site that had stood empty for 15 years. Having already commandeered and demolished a large part of the existing 21 Moorfields building, Crossrail had paved the way for the site’s wholesale redevelopment.

The development is designed in line with the City’s urban greening initiative to create an oasis on top of a station where one would not necessarily expect it: A vibrant mix of public spaces has been created, linking the Barbican to Moorfields, with over 20% of the site area devoted to bio-diverse habitats. An improved route for the Barbican Highwalk also creates a direct sightline from the Barbican to the newly pedestrianised Moorfields via a safe and accessible extended bridge and escalators.

The building was designed for Deutsche Bank’s 5,000 core staff, to their brief and employing the physical constraints described above. Cores were set to the north and south perimeter, creating deep floorplates with long sightlines and atria bringing light deep into the volume. Four football-field sized trading floors give way to a stepping form of light-filled workspace and amenity floors, with west-facing terraces on six levels taking advantage of the stepped section towards the Barbican.

The first floor is arranged around an internal street, connecting the reception to lift lobbies, atria and a second entrance on the western square. A separate five storey wellness building faces the primary building across this square, housing fitness and health studios, showers, and bike parking. An upper ‘crown’ hiding in the ‘shadow’ of a protected St Paul’s view houses the executive suites, client meeting rooms and dining rooms.

A user-centric architecture embodies the brand aspirations of the bank: Strength and Transparency. As such, staff community spaces are privileged as focal spaces which influence the organisation of the rest of the form. The interiors, designed by TP Bennett, create a theatrical experience for visitors while fostering collaboration and serendipitous encounters.

Deutsche Bank understand the importance of data in optimising systems and minimising waste:  As such, the base building incorporates smart and reactive building systems to minimise energy in operation, monitor carbon dioxide and provide the highest and most efficient comfort standards, as well as the facility for future occupiers to expand and operate as a SMART Building.

Complete project information

Location: City of London, United Kingdom

Category: Headquarters, Office Buildings

Status: Active

Start on site: February 2016

Completion: August 2023

Gross (internal + external) floor area: external: 74,150 m², internal: 72,198 m²

Architect: WilkinsonEyre

Client: Landsec

Owner: Lendlease

Structural engineer: Robert Bird Group

M&E consultant: Cundall

Quantity surveyor: Gardiner + Theobald

Landscape consultant: Andy Sturgeon

Acoustic consultant: Sandy Brown

Project manager: Gleeds

Planning advisor: Avison Young

CDM co-ordinator: Gardiner + Theobald

Approved building inspector: City of London

Main contractor: Sir Robert McAlpine

Photographer: Dirk Lindner, Ben Bisek

Unless otherwise specified, all images are from the internet and the copyright belongs to the original author or source organization. If there are any copyright issues involved, please contact us promptly and we will handle them properly as soon as possible.

Previous articleNew work by China Construction Southwest Court: Chengdu Tianfu New Area CourtNext article Zaha Hadid's latest proposal: Oystra Integrated Development Project in the United Arab Emirates

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recent Posts

Anaya Sanya Entrance Hall, Sunlight Courtyard2025年5月28日
Chengdu Luhu CPI Phase II: KOKO Market2025年5月22日
GMP renovation plan: Berlin State Library, dual renewal of a classic building2025年5月19日
Zaha Hadid’s latest proposal: Oystra Integrated Development Project in the United Arab Emirates2025年5月18日

Contact information

4 MORRIN ROAD MT. WELLINGTON AUCKLAND, NEW ZEALAND
64-(0)9-2159964
jackyhu@hyindustry.comwww.hyindustry.com

Recent Posts

Anaya Sanya Entrance Hall, Sunlight Courtyard2025年5月28日
Chengdu Luhu CPI Phase II: KOKO Market2025年5月22日
GMP renovation plan: Berlin State Library, dual renewal of a classic building2025年5月19日

Contact Us

+64- (0) 9-2159964
jackyhu@hyindustry.com